Road Construction Update

Southbound lanes of the Hwy 51/Snelling Ave. bridge (between St. Anthony Ave. and Concordia Ave.) will close at 8 p.m. on Friday, October 9, 2015 through 5 a.m. Monday, October 12, 2015 closed. Ramps at I-94 will remain open but, those exiting eastbound I-94 to Hwy 51/Snelling Ave. must turn south on 51/Snelling.  


Lane and Sidewalk Closures
As construction continues along Highway 51/Snelling Avenue lanes will close throughout the project area so crews can mill and resurface the road. Sidewalks will also be closed for short periods of time. Pedestrians will be detoured as crews replace sidewalks, install ornamental lighting and build sidewalk platforms for Bus Rapid Transit.